Most ice dams on Lehi roofs start inside the house. Heat leaks through the top-floor ceiling into the attic and warms the roof deck from below. Snow on the upper roof melts, and the water flows down until it reaches the eave, the part of the roof that sticks out past the exterior walls with no heated space under it. There it freezes into a ridge of ice. Each new round of meltwater pools behind that ridge and seeps under the shingles toward the roof deck.
The shingles play no part in starting that cycle, which is why replacing them alone leaves the problem in place. Stopping it takes four steps, done in sequence: close the air leaks from the living space into the attic, add insulation, balance the attic vents, and install an ice barrier along the eaves. Fall is the time to check all four, before snow starts sticking to Lehi roofs.
An ice dam is a band of ice along the lower edge of a roof that blocks meltwater from running off. University of Minnesota Extension explains that it forms when snow covers a roof whose upper surface averages above 32°F while the edge stays below freezing. Water pools behind the ice, finds openings in the roof covering, and can end up in the attic, the exterior walls, or a ceiling.
Yes. Lehi averages about 41 inches of snow and about 114 nights at or below freezing a year, based on NOAA's 1991-2020 climate normals for the Pleasant Grove station, about 6 miles away. More than half of that snow falls in December and January, when average lows sit at 25°F and 24°F.
That is about 57% of the 72.9 inches Worcester, Massachusetts, averages over the same 30 years. An ice dam needs snow on the roof, freezing air outside, and a roof deck warmed from below, all at the same time. Lehi delivers the first two every winter, while your attic delivers the third.
University of Minnesota Extension traces most ice dams to heat from the house, and often to warm air leaking into the attic through gaps in the top-floor ceiling. The same source lists features that raise the risk. If your house has any of these, look in the attic before the snow starts:
Work through the four fixes in sequence. Sealing comes before insulation because most attic insulation slows heat but does not stop air from moving through it.
|
Order |
What to do |
What it fixes |
Who does it |
|
1 |
Seal gaps in the top-floor ceiling around lights, the attic hatch, pipes, and wires |
Blocks the warm air that heats the roof deck |
Weatherization or insulation contractor |
|
2 |
Add insulation to the attic floor |
Cuts the heat that passes through the ceiling |
Insulation contractor |
|
3 |
Pair intake vents at the eaves with exhaust vents near the ridge |
Holds the roof deck near the outside air temperature |
Roofer |
|
4 |
Install an ice barrier along the eaves |
Keeps water out of the house if a dam still forms |
Roofer, when the roof is replaced |
For step 1, ask the contractor for a blower door test, which measures how airtight the ceiling is. An infrared camera scan can show where the heat escapes.
For step 2, ENERGY STAR recommends R60 for an uninsulated attic in climate zone 5, which includes Utah County. If the attic already has 3 to 4 inches of insulation, the recommendation is to add R49.
For step 3, skip the powered attic fan. UMN Extension advises against mechanical attic ventilation as an ice dam fix, because it can cause moisture problems in the attic and put the house under negative pressure.
An ice barrier is usually a waterproof membrane that sticks to the roof deck under the shingles along the roof edge. When an ice dam forms, the barrier keeps the water backed up behind it from reaching the wood.
Under the International Residential Code, the barrier reaches from the bottom edge of the roof to a point at least 24 inches inside the exterior wall line. The code leaves it to each local jurisdiction to decide whether an ice barrier is required, so the rule depends on where the house sits.
Massachusetts answers yes for every town in the state. The roofers in Worcester, MA at Powersol Roofing treat that 24-inch line as a minimum and run the membrane farther up on houses with deep overhangs, because on a wide overhang the code minimum can end right where the ice ridge forms.
Lehi homeowners can ask for the same detail. If you're collecting roof bids this fall, have each roofer write down whether an ice barrier is included and how far up the roof it runs, in inches.
Most of this list fits in an afternoon:
If anything on the list needs a professional, hire a licensed one. Utah licenses roofing contractors through the Division of Professional Licensing under the S280 classification, and the free Verify a License search at dopl.utah.gov shows whether a license is active. Ask for photos of anything the roofer finds, so you see the problem before you pay to fix it.
No. New shingles do nothing about the attic heat that melts the snow. A replacement does give the roofer access to two things that help: adding an ice barrier at the eaves and opening up eave vents buried under insulation. The air sealing and insulation are separate attic jobs.
Look for a thick ridge of ice along the roof edge, often with icicles hanging from it. Inside, water stains on ceilings or exterior walls during a cold stretch point to water backing up under the shingles.
Chipping breaks shingles, and anyone on a roof in winter risks a fall. UMN Extension recommends hiring a professional. If water is already coming inside, running tap water over the dam on a warm day can cut a drainage channel, but the channel stops working within days.
Snow slides off metal more easily than off asphalt shingles, which helps. Ice still builds at the eave of any roof sitting over a warm attic, metal included. The fix for the cause is the same for both roof types: seal and insulate the attic.